Dust and residue removal
We clean accessible floors, windows, fixtures, restrooms, and other interior surfaces after trades release them for cleaning. Entrances and hardscape areas are assessed separately when included in the work.
Cleaning through each project phase
Rough, progress, phased, final, and turnover cleaning support different stages of a commercial project. Punch-list touch-ups and pre-opening cleaning address areas already released by the responsible trade.
Floor care and ongoing cleaning
Surface-specific needs receive separate floor care. After the construction handoff, commercial cleaning supports regular use of the property.
Lining cleanup up with your handover date
Construction cleanup works best when it is booked before the project ends. Knowing the handover date lets us plan each phase so the space is ready when the keys change hands.
Areas released early by the trades can be cleaned first, so the final clean before opening is a shorter, finishing pass.
A few useful answers
Common questions
Does post-construction cleaning include debris hauling?
This service addresses dust and routine cleaning residue. It does not include heavy debris hauling, dumpster service, or unrestricted residue removal.
Does the cleaning team complete trade work or inspections?
No. Repairs, installation, demolition, and code correction remain with the responsible trades. Cleaning does not include inspection authority, permit closeout, site security, or responsibility for other trades.
Does the service include hazardous material remediation?
No. Hazardous or regulated remediation requires a separate specialist service.
How early should we book cleanup for a construction project?
While the project is still underway, so each phase can be planned around your handover date.
